Quick Answer

Before a machete shipment leaves, check finished goods against the approved drawing, reference sample, purchase order and packing specification. Define each model’s lot and sampling plan, then inspect blade dimensions, edge, handle, finish, guards, marks and cartons. Record defects with measured values and photos. Sampling does not prove every unit is sound; unresolved critical deviations require the agreed hold and follow-up.

Key Takeaways

Define the Lot and Governing Documents

Give the inspector the signed specification, latest profile drawing, approved finished sample, artwork proof, purchase order and allowed deviations. Confirm that enough finished goods are accessible.

Separate lots by model and relevant production period. Agree in advance on sample selection, defect categories, counts and acceptance criteria. Select across cartons and pallet positions rather than accepting display pieces chosen by the factory.

Pre-shipment controls and evidence
Checkpoint Verify against Record or action
Lot and quantity Model, purchase order, packing list Cartons, units and inaccessible stock.
Finished tool Current drawing and sample Measurements and defects by sample.
Marks and packing Artwork and packing specification Photos, guard fit and carton count.
Disposition Agreed acceptance and hold rules Decision, corrective action, reinspection.

Compare Blade and Handle With the Reference

Measure blade and overall length from agreed endpoints, then compare width, thickness, tip and any hook with the approved outline. Inspect the working edge, burrs, chips, straightness and finish.

Confirm specified steel with traceable material records when required. Appearance or a single hardness reading cannot identify chemistry. Check grip shape, gaps, cracks and fastener seating on assembled tools; document any movement.

Verify Guards, Marking and Cartons

Check logo, SKU, lot and required labels against approved artwork and destination requirements. Test the ordered guard or sheath on the actual tip. Look for edge contact, punctures, trapped moisture and mixed models inside cartons.

Count inner packs and accessories; reconcile carton count and labels with the packing list. Photograph a complete packed unit and an opened master carton. Record any stock the inspector could not access.

Request a Wholesale Quote:Whatsapp : (+86 13383021196)  E-mail : gemlight@ganzhedao.com

What Should the Inspection Brief Request?

RFQ checklist:

  1. Revision-controlled specification: prevent inspection against superseded samples.
  2. Lot definition and quantities: keep different models from being pooled.
  3. Sampling and defect rules: establish the pass/hold decision before findings emerge.
  4. Measurement points and tools: make dimensions and tolerances repeatable.
  5. Marking and packing matrix: catch wrong SKUs and missing guards.
  6. Report, photos and reinspection rule: document corrective action before release.

For general inspection scope, see SGS manufacturing inspection. Use the agreed purchase specification to set this order’s actual limits.

Buyer FAQ

Does a passed sample inspection prove every machete is good?

No. It applies to the sampled lot under the agreed plan, not every unit.

Can the factory ship after fixing a failed sample?

Only after the agreed corrective process and any required reinspection and buyer release.

Should a generic steel report count?

Only if its identifiers and scope trace to the specified production material and order.

Inquiry: Share the current drawing, sample ID and packing plan through your established inquiry route to request a matched inspection brief.

Request a Wholesale Quote:Whatsapp : (+86 13383021196)  E-mail : gemlight@ganzhedao.com

RELATED POSTS

Submit Your Sourcing Request

To make it easier for you to receive a quote, simply leave your information, and we will contact you as soon as possible.